A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Kadi, Y.

Paper Title Page
MOPLT009 The Design of the New Fast Extraction Channel for LHC 548
 
  • J. Borburgh, B. Balhan, E.H.R. Gaxiola, B. Goddard, Y. Kadi, J.A. Uythoven
    CERN, Geneva
 
  The Large Hadron Collider (LHC) project requires the modification of the existing extraction channel in the long straight section 6 of the CERN Super Proton Synchrotron (SPS). The new extraction will be used to transfer protons at 450 Gev/c as well as ions via the 2.8 km long transfer line TI 2 to the clockwise ring of the LHC. As the resonant extraction to the present SPS west area will be stopped after 2004, the electrostatic septa will be replaced by new fast extraction kicker magnets. The girder for the existing DC septa will be modified to accommodate a new septum protection element. Other modifications concern the replacement of a machine quadrupole, a new scheme for the extraction bumpers, new instrumentation and interlocks. The requirements and the design of the new extraction channel will be described as well as the modifications which will mainly be carried out in the long SPS shutdown 2005.  
MOPLT012 Collimation in the Transfer Lines to the LHC 554
 
  • H. Burkhardt, B. Goddard, Y. Kadi, V. Kain, W.J.M. Weterings
    CERN, Geneva
 
  The intensities foreseen for injection into the LHC are over an order of magnitude above the expected damage levels. The TI 2 and TI 8 transfer lines between the SPS and LHC are each about 2.5 km long and comprise many magnet families. Despite planned power supply surveillance and interlocks, failure modes exist which could result in uncontrolled beam loss and serious transfer line or LHC equipment damage. We describe the collimation system in the transfer lines that has been designed to provide passive protection against damage at injection. Results of simulations to develop a conceptual design are presented. The optical and physical installation constraints are described, and the resulting element locations and expected system performance presented, in terms of the phase space coverage, local element temperature rises and the characteristics of the beam transmitted into the LHC.  
MOPLT021 Attenuation and Emittance Growth of 450 GeV and 7 TeV Proton Beams in Low-Z Absorber Elements 581
 
  • V. Kain, B. Goddard, Y. Kadi, R. Schmidt
    CERN, Geneva
 
  The intensity of the LHC beams will be several orders of magnitude above the damage thresholds for equipment, at 7 TeV, but also already at injection energy of 450 GeV. Passive protection of the equipment against failures during beam transfer, injection and dumping of the beam with absorbers and collimators is foreseen to ensure safe operation. Since these protection devices must be robust in case of beam impact, low-Z materials such as graphite are favored. The reduction of the energy density of the primary beam by the absorber is determined by the attenuation of the beam due to nuclear collisions and the emittance growth of the surviving protons due to scattering processes. Absorbers with low density materials tend to be several meters long to ensure sufficient reduction of the transverse energy density of the impacting beam. The physics principles leading to attenuation and emittance growth for a hadron beam traversing matter are summarised, and FLUKA simulation results for 450 GeV and 7TeV proton beams on low-Z absorbers are compared with theoretical predictions. Design criteria for the LHC absorbers can be derived from these results. As an example, for the transfer line from SPS to LHC a short, low-Z absorber has been proposed to protect the LHC injection elements.