A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Hancock, S.

Paper Title Page
MOPLT007 Base Line Design for a Beta-beam Neutrino Facility 542
 
  • M. Benedikt, S. Hancock, M. Lindroos
    CERN, Geneva
 
  The term beta-beam has been coined for the production of pure beams of electron neutrinos or their antiparticles through the decay of radioactive ions circulating in a storage ring. The neutrino source itself consists of a high energy storage ring (gamma ~150), with long straight sections in line with the experiment(s). The radioactive ions (6He and 18Ne) will be produced in an ISOL type target system. Due to the short life times of around 1s at rest, the beam needs to be accelerated as quickly as possible. For this a staged system of accelerators is proposed. The chain starts with a linac followed by a rapid cycling synchrotron for acceleration up to ~300 MeV/u. For further acceleration the existing PS and SPS machines are used. Finally, after acceleration to SPS top energy, the ions are transferred to the decay ring where they are merged with the already circulating bunch through a longitudinal stacking procedure. The base line design of the beta beam facility will be presented and the major design problems encountered as well possible solutions will be discussed.  
TUPLT011 The LHC Lead Ion Injector Chain 1153
 
  • K. Schindl, A. Beuret, A. Blas, J. Borburgh, H. Burkhardt, C. Carli, M. Chanel, T. Fowler, M. Gourber-Pace, S. Hancock, C.E. Hill, M. Hourican, J.M. Jowett, K. Kahle, D. Kuchler, A.M. Lombardi, E. Mahner, D. Manglunki, M. Martini, S. Maury, F. Pedersen, U. Raich, C. Rossi, J.-P. Royer, R. Scrivens, L. Sermeus, E.N. Shaposhnikova, G. Tranquille, M. Vretenar, T. Zickler
    CERN, Geneva
 
  A sizeable part of the LHC physics programme foresees heavy ion (lead-lead) collisions with a design luminosity of 1027 cm-2 s-1. This will be achieved after an upgrade of the ion injector chain comprising Linac3, LEIR, PS and SPS machines. Each LHC ring will be filled in ~10 minutes with ~600 bunches, each of 7 107 Pb ions. Central to the scheme is the Low Energy Ion Ring (LEIR), which transforms long pulses from Linac3 to high-brilliance bunches by means of 6D multi-turn injection and accumulation via electron cooling. Major limitations along the chain, including space charge, intra-beam scattering, vacuum issues, and emittance preservation are highlighted. The conversion from LEAR (Low Energy Antiproton Ring) to LEIR includes new magnets and power converters, high-current electron cooling, broad-band RF cavities, upgraded beam diagnostics, and UHV vacuum equipment relying on beam scrubbing to achieve a few 10-12 mbar. Major hardware changes in Linac3 (Electron Cyclotron Resonance source, repetition rate, energy ramping cavity), PS (new injection hardware, elaborate RF gymnastics, stripping insertion), and SPS (100 MHz system) are described. An early beam scenario, using fewer bunches but the same bunch intensity to deliver a lower luminosity, reduces the work required for LHC ion operation in spring 2008.