A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Gerigk, F.

  
Paper Title Page
WEOCCH01 A New 180 MeV H- Linac for Upgrades of ISIS 153
 
  • F. Gerigk
    CCLRC/RAL/ASTeC, Chilton, Didcot, Oxon
 
  Several options have been studied to raise the beam power of the ISIS spallation neutron source to a level of 1 MW with the possibility of going to 4-5 MW in the longer term. All scenarios can operate in 2 modes, where the beam power is either delivered to a spallation target or, alternatively, to a target suitable to produce muons via pion decay for a neutrino factory. A more recent upgrade option takes an intermediate step and uses a 180 MeV H- linac, which is also foreseen for the 4-5 MW upgrade, as a replacement for the current 70 MeV injector. First estimates indicate that, due to the lower space charge forces, the ring would be able to carry twice as many particles, thus doubling the final beam power to 0.5 MW. This paper presents a first design for the 180 MeV linac, using a triple frequency jump from 234.8 to 704.4 MHz. The design profits from the development of 704.4 MHz cavities and RF equipment within the framework of the European HIPPI collaboration. The low frequency for the front-end was chosen to ease the DTL design as well as the development of a low energy beam chopper, which will be necessary to reduce beam losses at injection into the synchrotron.  
Video of talk
Transparencies