WEPLT024 Scheduling the Installation of the LHC Injection Lines 1876
 
  • L. Lari, H. Gaillard, V. Mertens
    CERN, Geneva
 
  The installation of the two LHC injection lines has to fit within tight milestones of the LHC project and of CERN?s accelerator activity in general. For instance, the transfer line from the SPS to LHC point 8 (to fill the anti-clockwise LHC ring) should be tested with beam before the end of 2004 since the SPS will not run in 2005. It will first serve during the LHC sector test in 2006. Time constraints are also very strong on the installation of the transfer line from the SPS to LHC point 2 (for the clockwise LHC ring): its tunnel is the sole access for the LHC cryo-magnets and a large part of the beam line can only be installed once practically all LHC cryo-magnets are in place. Of course, the line must be operational when the LHC starts. This paper presents the various constraints and how they are taken into account for the logistics and installation planning of the LHC injection lines.  
WEPLT042 Scheduling the Installation of the Large Hadron Collider 1924
 
  • S. Weisz, K. Foraz, H. Gaillard, L. Lari
    CERN, Geneva
 
  The size and complexity of the LHC project at CERN calls for a strong co-ordination of all installation activities. The detailed installation planning has to take into account many constraints such as the component production rates, the installation contracts or the transport and handling requirements in a narrow tunnel with limited access points. The planning also needs to be flexible enough to cope with aleas that are unavoidable in such a large project that spans over many years. This paper describes the methodology followed by the team responsible for the planning and logistics in order to stay reactive to the actual progress of the installation and to keep optimizing the usage of resources.