A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Dolinskii, A.

Paper Title Page
TUPLT018 Layout of the Storage Ring Complex of the International Accelerator Facility for Research with Ions and Antiprotons at GSI 1174
 
  • P. Beller, K. Beckert, A. Dolinskii, B.  Franzke, F. Nolden, C. Peschke, M. Steck
    GSI, Darmstadt
 
  The storage ring complex of the new international accelerator facility consists of three different rings: the Collector Ring CR, the accumulator/decelerator ring RESR and the New Experimental Storage Ring NESR. The CR will serve for fast stochastic precooling of antiproton and rare isotope (RI) beams. Cooling time constants of about 100 ms for RI beams are envisaged. For experiments with RI beams the RESR serves as a decelerator ring. Precooled RI beams will be injected at 740 MeV/u and then decelerated to variable energies down to 100 MeV/u within about 1 s. The NESR will be the main instrument for nuclear and atomic physics. Besides experiments using an internal gas target, the NESR offers the possibility to collide circulating bunches of ions with electron bunches counter-propagating in a small 500 MeV electron storage ring. The physics program with antiprotons requires the accumulation of high intensity antiproton beams. The accumulation of 7×1010 antiprotons at 3 GeV per hour is foreseen. This will be accomplished by operating the RESR as an accumulator ring equipped with a stochastic cooling system. The NESR could then be used to decelerate antiprotons to 30 MeV.  
TUPLT019 Nonlinear Effects Studies for a Large Acceptance Collector Ring 1177
 
  • A. Dolinskii, K. Beckert, P. Beller, B.  Franzke, F. Nolden, M. Steck
    GSI, Darmstadt
 
  A large acceptance collector ring (CR) is designed for fast cooling of rare isotope and antiproton beams, which will be used for nuclear physics experiments in the frame of the new international accelerator facility recently proposed at GSI. This contribution describes the linear and non-linear optimisation used to derive a lattice solution with good dynamic behaviour simultaneously meeting the demands for very fast stochastic cooling for two optical modes (for rare isotope and antiproton beams). Effects due to non-linear field contributions of the magnet field in dipoles and quadrupoles are very critical in this ring. Using a single particle dynamics approach, the major magnetic non-linearities of the CR are studied. We discuss the particle dynamics of the dipole and quadrupole fringe fields and the their influence on the dynamic aperture and on the tune. Additionally, the CR will be operated at the transition energy (isochronous mode) for time of flight (TOF) mass spectrometery of short-lived radioactive ions. For this mode a specific correction scheme is required to reach a high degree of isochronism over a large acceptance.  
WEPLT056 An Electron Cooling System for the Proposed HESR Antiproton Storage Ring 1966
 
  • M. Steck, K. Beckert, P. Beller, A. Dolinskii, B.  Franzke, F. Nolden
    GSI, Darmstadt
  • V.V. Parkhomchuk, V.B. Reva, A.N. Skrinsky, V.A. Vostrikov
    BINP SB RAS, Novosibirsk
 
  The HESR storage ring in the proposed new international accelerator facility will provide high quality antiproton beams for experiments with an internal target. In order to achieve the design luminosity for collisions with a hydrogen target powerful beam cooling is required. For dedicated experiments ultimate resolution is demanded. Therefore it is foreseen to provide cooled antiproton beams in the energy range 0.8-14 GeV with an energy spread of 100 keV or better. According to computer simulations the required cooling rates can be achieved by electron cooling with an electron current of 1 A. The conceptual design of an electron beam device which is based on electrostatic acceleration of the electrons and their transport in longitudinal magnetic fields into a cooling section with a strong magnetic field of up to 0.5 T will be presented. This design will allow cooling in the magnetized regime in order to reach the required high cooling rates. Some novel features for the generation and regulation of the accelerating voltage and for the beam transport are proposed.  
WEPLT057 Simulation Results on Cooling Times and Equilibrium Parameters for Antiproton Beams at the HESR 1969
 
  • A. Dolinskii, O. Boine-Frankenheim, B.  Franzke, M. Steck
    GSI, Darmstadt
  • A. Bolshakov, P. Zenkevich
    ITEP, Moscow
  • A.O. Sidorin, G.V. Troubnikov
    JINR, Dubna, Moscow Region
 
  The High Energy Storage Ring HESR is part of the "International Accelerator Facility for Ion and Antiproton Beams" proposed at GSI. For internal target experiments with antiproton beams in the energy range 0.8 GeV to 14.5 GeV a maximum luminosity of 5 inverse nbarn per second and a momentum resolution on the order of 10 ppm have to be attained. Electron cooling is assumed to be the most effective way to counteract beam heating due to target effects and intra-beam scattering. Cooling times and equilibrium parameters have been determined by means of three different computer codes: BETACOOL, MOCAC, and PTARGET. The results reveal that the development of fast, "magnetized" electron cooling with beam currents of up to 1 A and variable electron energies of up to 8 MeV in an extremely homogeneous longitudinal magnetic field of up to 0.5 T is crucial to achieve the required equilibrium beam parameters over the envisaged range of antiproton energies.