A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Delayen, J.R.

Paper Title Page
MOPLT153 Electron-Ion Collider at CEBAF: New Insights and Conceptual Progress 893
 
  • Y.S. Derbenev, A. Afanasev, K. Beard, S.A. Bogacz, P. Degtiarenko, J.R. Delayen, A. Hutton, G.A. Krafft, R. Li, L. Merminga, M. Poelker, B.C. Yunn, Y. Zhang
    Jefferson Lab, Newport News, Virginia
  • P.N. Ostroumov
    ANL/Phys, Argonne, Illinois
 
  We report on progress in conceptual development of the proposed high luminosity (up to 1035/cm2s) and efficient spin manipulation (using figure 8 boosters and collider rings) Electron-Ion Collider at CEBAF based on use of polarized 5-7 GeV electrons in superconduction energy recovering linac (ERL with circulator ring, kicker-operated) and 30-150 GeV ion storage ring (polarized p, d. He3, Li and unpolarized nuclei up to Ar, all totally stripped). Ultra-high luminosity is envisioned to be achievable with short ion bunches and crab-crossing at 1.5 GHz bunch collision rate interaction points. Our recent studies concentrated on simulation of beam-beam interaction, preventing the electron cloud instability, calculating luminosity lifetime due to Touschek effect in ion beam and background scattering of ions, experiments on energy recovery at CEBAF, and other. These studies have been incorporated in the development of the luminosity calculator and in formulating minimum requirements to the polarized electron and ion sources  
TUPKF072 Production and Performance of the CEBAF Upgrade Cryomodule Intermediate Prototypes 1105
 
  • A-M. Valente, E. Daly, J.R. Delayen, M. Drury, R. Hicks, C. Hovater, J. Mammosser, H.L. Phillips, T. Powers, J.P. Preble, C. Reece, R.A. Rimmer, H. Wang
    Jefferson Lab, Newport News, Virginia
  • C. Thomas-Madec
    SOLEIL, Gif-sur-Yvette
 
  We have installed two new cryomodules, one in the nuclear physics accelerator (CEBAF) and the other in the Free Electron Laser (FEL) of Jefferson Lab. The new cryomodules consist of 7-cell cavities with the original CEBAF cell shape and were designed to deliver gradients of 70 MV/module. Several significant design innovations were demonstrated in these cryomodules. This paper describes the production procedures, the performance characteristics of these cavities in vertical tests, results of tests in the new cryomodule test facility (CMTF) as well as the commissioning in the CEBAF tunnel and FEL. Performances and limitations after installation in the accelerators are discussed in this paper along with improvements proposed for future cryomodules.