A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Chemli, S.

Paper Title Page
MOPLT006 The New Layout of the LHC Cleaning Insertions 539
 
  • R.W. Assmann, O. Aberle, O.S. Brüning, S. Chemli, D. Gasser, J.-B. Jeanneret, J.M. Jimenez, V. Kain, E. Métral, G. Peon, S. Ramberger, C. Rathjen, T. Risselada, F. Ruggiero, L. Vos
    CERN, Geneva
  • D. Kaltchev
    TRIUMF, Vancouver
 
  The improved LHC collimation system required significant changes in the layout and design of the warm insertion IR7. Requirements for collimation, optics, impedance, vacuum, and additional infrastructure are described and the adopted layout is discussed. Various design principles have been explored during the re-design, ranging from a regular 90 degree lattice and special low impedance lattices to an option with additional warm quadrupole units that could have extended the usable space for collimator installations in the insertion. The various constraints for the optics and cleaning design in the LHC cleaning insertions are summarized. Magnet positions and collimators were moved significantly, such that a good cleaning efficiency was maintained while impedance was reduced by a factor of two. Metallic phase 2 collimators allow a better efficiency than originally achievable and additional scrapers were allocated. The required infrastructure was specified, including a powerful cooling system for the collimators.  
WEPLT025 LHC Reference Database : Towards a Mechanical, Optical and Electrical Layout Database 1879
 
  • P. Le Roux, S. Chemli, A. Jimeno Yepes, B. Maire, H. Prin, A. Vergara-Fernández, M. Zerlauth
    CERN, Geneva
 
  The LHC project has entered a phase of integration and installation of thousands of diverse components. The Hardware Commissioning work has also started. Collecting and distributing reliable and coherent information on the equipments and their layout becomes a crucial requirement in the lifecycle of the project. Existing database tools had to evolve to a more generic model to cover not only optical layout, but also the mechanical and the electrical aspects. This paper explains the requirements, the implementation and the benefits of this new database model.  
WEPLT040 Layout Drawings of the LHC Collider 1918
 
  • A. Vergara-Fernández, S. Chemli, B. Maire, Y. Muttoni
    CERN, Geneva
  • A. Kournossenko, R. Zalyalov
    IHEP Protvino, Protvino, Moscow Region
 
  The team in charge of the LHC integration largely uses 3D scenes combining functional positions of equipments and the 3D CAD model issued from the Cern Drawing Directory (CDD) repository. This is made possible through the Digital Mock-Up tool developed at CERN. Giving dimensions in 3D context is a challenge with the current 3D CAD tools used at CERN. Requirements from users groups have made clear a need for automatic production of 2D layout drawings. This paper presents the retained solution to create on-request dimensioned drawings, to publish them, while maintaining coherence and consistency with the 3D integration scenes. Reliability of the information, on-line availability of the latest layout changes on dimensions and positions of equipments, and the maintenance of the facility will also be described.