A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Broemmelsiek, D.R.

Paper Title Page
MOPLT110 Stochastic Cooling in Barrier Buckets at the Fermilab Recycler 794
 
  • D.R. Broemmelsiek, M. Hu, S. Nagaitsev
    Fermilab, Batavia, Illinois
 
  The Fermilab Recycler is a fixed 8-GeV kinetic energy storage ring located in the Fermilab Main Injector tunnel near the ceiling. The role of stochastic cooling in the Recycler is to pre-cool the transverse phase-space of injected antiprotons for efficient electron cooling. This requires a gated stochastic cooling system working on beam confined in a barrier bucket. The performance of this system is reviewed. In addition, a study of the cooling rates and asymmptotic emittances as a function of beam intensity is presented.  
TUPLT151 Status of the Fermilab Electron Cooling Project 1485
 
  • J.R. Leibfritz, D.R. Broemmelsiek, A.V. Burov, K. Carlson, B. Kramper, T. Kroc, M. McGee, S. Nagaitsev, L. Nobrega, G. Saewert, C.W. Schmidt, A.V. Shemyakin, M. Sutherland, V. Tupikov, A. Warner
    Fermilab, Batavia, Illinois
  • G. Kazakevich
    BINP SB RAS, Novosibirsk
  • S. Seletsky
    Rochester University, Rochester, New York
 
  Fermilab has constructed and commissioned a full-scale prototype of a multi-MV electron cooling system to be installed in the 8.9 GeV/c Fermilab Recycler ring. This prototype was used to test all of the electron beam properties needed for cooling. However, because the prototype is not located within proximity of the Recycler ring, the actual electron cooling of antiprotons can not be demonstrated until it is relocated. The Fermilab electron cooling R&D project is scheduled to be completed in May, 2004 at which time it will be disassembled and relocated to a newly constructed facility where it will be installed in the Recycler. This paper describes the experimental results obtained with the prototype cooler system, gives an overview of the new electron cooling facility, and discusses the overall status of the project.  
WEPKF072 Clearing Electrodes for Vacuum Monitoring at the Fermilab Recycler 1771
 
  • D.R. Broemmelsiek, S. Nagaitsev
    Fermilab, Batavia, Illinois
 
  The Fermilab Recycler is a fixed 3.3-km 8-GeV kinetic energy storage ring located in the Fermilab Main Injector tunnel. Each split-plate beam position monitor in the Recycler is also used to generated an ion clearing field for ions trapped by the antiproton beam. Approximately 100 locations have been instrumented with pico-amp meters to measure the electron current, generated by the beam-ionized residual gas in the vacuum chamber. This electron current is found to be proportional to the beam current and to the residual gas pressure in the Recycler and may be used to monitor the Recycler vacuum.