Author: Whyte, C.G.
Paper Title Page
WEPME020 Commissioning of the MICE RF System 2297
 
  • A.J. Moss, A.E. Wheelhouse
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire, United Kingdom
  • S.M.H. Alsari
    Imperial College of Science and Technology, Department of Physics, London, United Kingdom
  • A.J. Dick, K. Ronald, D.C. Speirs, C.G. Whyte
    USTRAT/SUPA, Glasgow, United Kingdom
  • T. Stanley
    STFC/RAL, Chilton, Didcot, Oxon, United Kingdom
  • C.J. White
    STFC/DL, Daresbury, Warrington, Cheshire, United Kingdom
 
  The Muon Ionisation Cooling Experiment (MICE) is being constructed at Rutherford Appleton Laboratory in the UK. The muon beam will be cooled using multiple hydrogen absorbers then reaccelerated using an RF cavity system operating at 201MHz. This paper describes recent progress in commissioning the amplifier systems at their design operation conditions, installation and operation within the Ionisation Cooling Test Facility (ICTF) as part of the MICE project.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEPME020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)