Author: Pellegrino, L.
Paper Title Page
WEOCA03 DAΦNE Operation with the Upgraded KLOE-2 Detector 1883
 
  • C. Milardi, D. Alesini, M.E. Biagini, M. Boscolo, B. Buonomo, S. Cantarella, A. De Santis, G.O. Delle Monache, G. Di Pirro, A. Drago, L.G. Foggetta, O. Frasciello, A. Gallo, A. Ghigo, F. Guatieri, S. Guiducci, F. Iungo, C. Ligi, G. Mazzitelli, L. Pellegrino, R. Ricci, U. Rotundo, C. Sanelli, G. Sensolini, M. Serio, A. Stecchi, A. Stella, M. Zobov
    INFN/LNF, Frascati (Roma), Italy
  • R. Gargana, A. Michelotti
    Consorzio Laboratorio Nicola Cabibbo, Frascati, Italy
  • D.N. Shatilov
    BINP SB RAS, Novosibirsk, Russia
  • M. Tobiyama
    KEK, Ibaraki, Japan
  • A. Valishev
    Fermilab, Batavia, Illinois, USA
 
  The DAΦNE collider has been successfully commissioned after the experimental detector modification and a major upgrade and consolidation program involving a large part of the accelerator complex. This paper presents the Φ-Factory setup and the achieved performances in terms of beam currents, luminosity, detector background and related aspects.  
slides icon Slides WEOCA03 [2.424 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEOCA03  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRI002 DAΦNE General Consolidation and Upgrade 3760
 
  • C. Milardi, D. Alesini, S. Bini, B. Buonomo, S. Cantarella, A. De Santis, G.O. Delle Monache, G. Di Pirro, A. Drago, L.G. Foggetta, O. Frasciello, A. Gallo, A. Ghigo, F. Iungo, C. Ligi, L. Pellegrino, R. Ricci, U. Rotundo, C. Sanelli, G. Sensolini, A. Stecchi, A. Stella, M. Zobov
    INFN/LNF, Frascati (Roma), Italy
  • R. Gargana, A. Michelotti
    Consorzio Laboratorio Nicola Cabibbo, Frascati, Italy
 
  In the first six months of 2013 the KLOE detector has been upgraded inserting new detector layers in the inner part of the apparatus, around the interaction region. The long shutdown has been used to undertake a general consolidation program aimed at improving the Φ-Factory operation stability and reliability and, in turn, the collider uptime. In this context several systems have been revised and upgraded, new diagnostic elements have been installed, some critical components have been modified and the interaction region mechanical support structure design has been developed to improve its mechanical stability and to deal with the weight added by the new detector layers.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THPRI002  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRI042 Design and RF Test of Damped C-Band Accelerating Structures for the ELI-NP Linac 3856
 
  • D. Alesini, S. Bini, R. D. Di Raddo, V.L. Lollo, L. Pellegrino
    INFN/LNF, Frascati (Roma), Italy
  • L. Ficcadenti, V. Pettinacci
    INFN-Roma, Roma, Italy
  • L. Palumbo
    URLS, Rome, Italy
  • L. Serafini
    Istituto Nazionale di Fisica Nucleare, Milano, Italy
 
  The linac energy booster of the European ELI-NP proposal foresees the use of 12 traveling wave C-Band structures, 1.8 m long with a field phase advance per cell of 2pi/3 and a repetition rate of 100 Hz. Because of the multi-bunch operation, the structures have been designed with a damping of the HOM dipoles modes in order to avoid beam break-up (BBU). They are quasi-constant gradient structures with symmetric inputs couplers and a strong damping of the HOM in each cell. An optimization of the electromagnetic and mechanical design has been done to simplify the fabrication and to reduce their cost. In the paper we shortly review the whole design criteria and we illustrate the low and high power RF test results on prototypes that shown the feasibility of the structure realization and the effectiveness of the HOM damping.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THPRI042  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRI043 Thermal-mechanical Analysis of the RF Structures for the ELI-NP Proposal 3860
 
  • V. Pettinacci
    INFN-Roma, Roma, Italy
  • D. Alesini, L. Pellegrino
    INFN/LNF, Frascati (Roma), Italy
  • L. Palumbo
    URLS, Rome, Italy
 
  The room temperature RF structures in the ELI-NP Linac will operate in multi-bunch with high repetition rate (100 Hz). For these reasons they are subject to some kW of power dissipated on the internal cavities surfaces. The resulting thermal deformation of the cavities shapes could imply variations in their electromagnetic fields. To limit these effects and optimize the cooling design, a fully coupled ElectroMagnetic- Thermal-Mechanical analysis has been performed on the S-Band Radiofrequency Gun and on the C-Band multi-cell structures. In the paper the study done in Ansys Workbench with HFSS and Ansys Mechanical is reviewed  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THPRI043  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)