MOPRO090 Top-up Operation at ALBA Synchrotron Light Source 301
 
  • M. Pont, G. Benedetti, J. Moldes, R. Muñoz Horta, A. Olmos, F. Pérez
    CELLS-ALBA Synchrotron, Cerdanyola del Vallès, Spain
 
  The ALBA light source has been operating in decay mode since May 2012. Now it is ready for top-up operation, which should become the standard operation mode for users from mid 2014. In this paper we are going to summarise the different steps that have taken place before the start of top-up operation: radiation safety simulations and measurements, upgrade of hardware and software interlocks, control software and injection optimisation.  