Author: Alsari, S.M.H.
Paper Title Page
WEPME020 Commissioning of the MICE RF System 2297
 
  • A.J. Moss, A.E. Wheelhouse
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire, United Kingdom
  • S.M.H. Alsari
    Imperial College of Science and Technology, Department of Physics, London, United Kingdom
  • A.J. Dick, K. Ronald, D.C. Speirs, C.G. Whyte
    USTRAT/SUPA, Glasgow, United Kingdom
  • T. Stanley
    STFC/RAL, Chilton, Didcot, Oxon, United Kingdom
  • C.J. White
    STFC/DL, Daresbury, Warrington, Cheshire, United Kingdom
 
  The Muon Ionisation Cooling Experiment (MICE) is being constructed at Rutherford Appleton Laboratory in the UK. The muon beam will be cooled using multiple hydrogen absorbers then reaccelerated using an RF cavity system operating at 201MHz. This paper describes recent progress in commissioning the amplifier systems at their design operation conditions, installation and operation within the Ionisation Cooling Test Facility (ICTF) as part of the MICE project.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEPME020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRI058 RF Delivery System for FETS 3902
 
  • S.M.H. Alsari, M. Aslaninejad, J.K. Pozimski, P. Savage
    Imperial College of Science and Technology, Department of Physics, London, United Kingdom
  • M. Dudman, A.P. Letchford
    STFC/RAL, Chilton, Didcot, Oxon, United Kingdom
 
  The Front End Test Stand (FETS) is an experiment based at the Rutherford Appleton Laboratory (RAL) in the UK. In this experiment, the first stages necessary to produce a very high quality, chopped H ion beam as required for the next generation of high power proton accelerators (HPPAs) are designed, built and tested. HPPAs with beam powers in the megawatt range have many possible applications including drivers for spallation neutron sources, neutrino factories, accelerator driven sub-critical systems, waste transmuters and tritium production facilities. An RF system outline, circulator high power tests, RF amplifiers tests, waveguide run with shielding and couplers design are presented and discussed in this paper. Experimental measurements of the system’s circulator and RF Amplifiers high power test will be presented as part of the system testing results.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THPRI058  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)