Author: Todd, B.
Paper Title Page
WEPC174 A Failure Catalogue for the LHC 2394
 
  • S. Wagner, R. Schmidt, B. Todd, J.A. Uythoven, M. Zerlauth
    CERN, Geneva, Switzerland
 
  The LHC, with a stored energy of more than 360 MJ per beam, requires a complex machine protection system to prevent equipment damage. The system was designed based on a large number of possible failures in the subsystems and operational phases of the LHC. This led to a mixed system with active and passive protection. The active part monitors many thousand parameters (such as beam losses, temperatures in superconducting magnets, power converter currents, etc.) and triggers a beam dump in case a failure is detected. The passive part includes protection elements like collimators and beam absorbers to ensure the prevention of damage in case of single turn beam losses (e.g. during beam transfer and injection). So far, the knowledge of the possible failures is distributed over the different teams involved in the design, construction and operation of the LHC. A newly started project aims at bringing together this knowledge in a common failure catalogue. The chosen approach in addition is expected to allow for the identification of failures that might not have been considered yet or that require further measures. This paper introduces the approach and presents the first experience.  
 
WEPS020 Study of an Energy Upgrade of the CERN PS Booster 2526
 
  • K. Hanke, O. Aberle, M. E. Angoletta, W. Bartmann, S. Bartolome, C. Bertone, A. Blas, J. Borburgh, D. Bozzini, A.C. Butterworth, C. Carli, P. Dahlen, T. Dobers, A. Findlay, R. Folch, N. Gilbert, J. Hansen, T. Hermanns, S. Jensen, P. Le Roux, L.A. Lopez Hernandez, E. Mahner, A. Masi, B. Mikulec, Y. Muttoni, A. Newborough, D. Nisbet, M. Nonis, S. Olek, M.M. Paoluzzi, S. Pittet, B. Puccio, V. Raginel, I. Ruehl, J. Tan, B. Todd, W.J.M. Weterings, M. Widorski
    CERN, Geneva, Switzerland
 
  CERN’s LHC injector chain will have to deliver beams with ultimate brilliance as the LHC is heading for increased luminosity in the coming years. In order to overcome bottlenecks in the injector chain, an increase of the beam transfer energy from the CERN Proton Synchrotron Booster (PSB) to the Proton Synchrotron (PS) has been investigated as a possible upgrade scenario. This paper gives an overview of the technical solutions and summarizes the conclusions of the feasibility study.