Author: Marcellini, F.
Paper Title Page
MOPC013 Design, Fabrication and High Power RF Test of a C-band Accelerating Structure for Feasibility Study of the SPARC Photo-injector Energy Upgrade 89
 
  • D. Alesini, R. Boni, G. Di Pirro, R. D. Di Raddo, M. Ferrario, A. Gallo, V.L. Lollo, F. Marcellini
    INFN/LNF, Frascati (Roma), Italy
  • G. Campogiani, A. Mostacci, L. Palumbo, S. Persichelli, V. Spizzo
    Rome University La Sapienza, Roma, Italy
  • T. Higo, K. Kakihara, S. Matsumoto
    KEK, Ibaraki, Japan
  • S. Verdú-Andrés
    TERA, Novara, Italy
 
  The energy upgrade of the SPARC photo-injector from 170 to 250 MeV will be done by replacing a low gradient 3m S-Band structure with two 1.5m high gradient C-band structures. The structures are traveling wave, constant impedance sections, have symmetric waveguide input couplers and have been optimized to work with a SLED RF input pulse. A prototype with a reduced number of cells has been fabricated and tested at high power in KEK (Japan) giving very good performances in terms of breakdown rates at high accelerating gradient (>50 MV/m). The paper illustrates the design criteria of the structures, the fabrication procedure and the high power RF test results.  
 
TUPC007 Kicker and Monitor for CTF3 Phase Feed Forward 1000
 
  • F. Marcellini, D. Alesini, A. Ghigo
    INFN/LNF, Frascati (Roma), Italy
 
  Funding: Work partially supported by the EuCARD research programme, Grant Agreement 227579, within the 'Assessment of Novel Accelerator Concepts'.
In the Compact LInear Collider (CLIC) the synchronization of the Drive Beam and the Main Beam has to be assured in the femtosecond range to avoid luminosity reduction of the collider. The Drive and Main Beams arrival time is measured with longitudinal monitors and the correction is applied changing the path length of one beam respect to the other in a magnetic chicane by means of two transverse fast stripline kicker. The performance of the feed forward system will be tested in the CLIC Test Facility (CTF3) measuring the phase at the linac exit, correcting in the chicane after the combination rings and comparing the longitudinal position change before the power RF production system. The developed phase monitors and kicker magnets for the test in CTF3 are described.
 
 
THPZ004 DAΦNE Tune-up for the KLOE-2 Experiment 3687
 
  • C. Milardi, D. Alesini, M.E. Biagini, S. Bini, C. Biscari, R. Boni, M. Boscolo, B. Buonomo, A. Clozza, G.O. Delle Monache, T. Demma, E. Di Pasquale, G. Di Pirro, A. Drago, M. Esposito, L.G. Foggetta, A. Gallo, A. Ghigo, S. Guiducci, C. Ligi, S.M. Liuzzo, F. Marcellini, G. Mazzitelli, L. Pellegrino, M.A. Preger, L. Quintieri, P. Raimondi, R. Ricci, U. Rotundo, C. Sanelli, M. Serio, F. Sgamma, B. Spataro, A. Stecchi, A. Stella, S. Tomassini, C. Vaccarezza, M. Zobov
    INFN/LNF, Frascati (Roma), Italy
  • S. Bettoni
    PSI, Villigen, Switzerland
 
  Funding: Work supported by the EuCARD research programme within the 'Assessment of Novel Accelerator Concepts' work package (ANAC-WP11).
In its continuous evolution DAΦNE, the Frascati lepton collider, is starting a new run for the KLOE-2 experiment, an upgraded version of the KLOE one. A new interaction region, based on the high luminosity Crab-Waist collision scheme, has been designed, built and installed. Several machine subsystems have been revised according to innovative design concepts in order to improve beam dynamics. Collimators and shieldings have been upgraded in order to minimize the background rates on the detector during coasting as well as injection operation. A wide measurement campaign has been undertaken to verify and quantify the effect of the modifications and to tune-up the collider in view of the 3 years long data-taking foreseen to deliver ~5 fb-1 to the experiment.