Paper | Title | Page |
---|---|---|
WEYMH01 | Status of the International Linear Collider | 2378 |
|
||
The general status of the International Linear Collider (ILC) project will be presented. After the publication of the RDR (Reference Design Report) in summer in 2007, the next milestone of the ILC project will be the Technical Design Report to be completed by the end of 2012. The GDE (Global Design Effort) has defined the period till 2010 summer as the Technical Design Phase 1 and is revisiting the design in RDR in the name of 'rebaselining'. The outline of the new design will be decided in March 2010 and will be reported in this talk together with the near future plan. |
||
|