A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Zhan, Y.

Paper Title Page
WEPE101 A 4-MW Target Station for a Muon Collider or Neutrino Factory 3590
 
  • H.G. Kirk
    BNL, Upton, Long Island, New York
  • J.J. Back
    University of Warwick, Coventry
  • C.J. Densham, P. Loveridge
    STFC/RAL, Chilton, Didcot, Oxon
  • X.P. Ding
    UCLA, Los Angeles, California
  • V.B. Graves
    ORNL, Oak Ridge, Tennessee
  • F. Ladeinde, Y. Zhan
    SUNY SB, Stony Brook, New York
  • K.T. McDonald
    PU, Princeton, New Jersey
 
 

We outline a program of engineering design and simulation for a target station and pion production/capture system for a 4-MW proton beam at the front end of a Muon Collider or a Neutrino Factory. The target system consists of a free liquid-metal (nominally mercury) jet immersed in a high-field solenoid magnet capture system that also incorporates the proton beam dump. Topics to be studied include optimization of proton beam and jet target parameters, of the magnetic configuration for capture and subsequent transport of pions and muons, of the beam dump, of the radiation/thermal shielding of the capture magnets, and of the beam windows.