A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Yano, Y.

Paper Title Page
TUPEA047 Digital LLRF System for STF S1 Global 1437
 
  • S. Michizono, D.A. Arakawa, S. Fukuda, H. Katagiri, T. Matsumoto, T. Miura, Y. Yano
    KEK, Ibaraki
 
 

S1 global will be operated at STF in KEK, where total 8 cavities will be installed. The digital llrf system to control the vector sum of the field gradients to be flat has been developed. All the digital llrf system including rf monitoring, piezo-control system will be shown. The new llrf system suitable for the DRFS scheme, which is also studied during S1 grobal, is also under development.

 
TUPEA048 Low Level RF System for cERL 1440
 
  • T. Miura, A. Akiyama, D.A. Arakawa, S. Fukuda, H. Katagiri, T. Matsumoto, S. Michizono, J.-I. Odagiri, Y. Yano
    KEK, Ibaraki
 
 

The compact ERL(cERL) is the energy recovery linac(ERL) test facility that is under construction at KEK. The stability of accelerating electric field of 0.1% rms in amplitude and 0.1deg. in phase is required for LLRF system. The status of LLRF system for cERL will be reported.

 
TUPE091 Recent Progress in the Energy Recovery Linac Project in Japan 2338
 
  • S. Sakanaka, M. Akemoto, T. Aoto, D.A. Arakawa, S. Asaoka, A. Enomoto, S. Fukuda, K. Furukawa, T. Furuya, K. Haga, K. Hara, K. Harada, T. Honda, Y. Honda, H. Honma, T. Honma, K. Hosoyama, M. Isawa, E. Kako, T. Kasuga, H. Katagiri, H. Kawata, Y. Kobayashi, Y. Kojima, T. Matsumoto, H. Matsushita, S. Michizono, T.M. Mitsuhashi, T. Miura, T. Miyajima, H. Miyauchi, S. Nagahashi, H. Nakai, H. Nakajima, E. Nakamura, K. Nakanishi, K. Nakao, T. Nogami, S. Noguchi, S. Nozawa, T. Obina, S. Ohsawa, T. Ozaki, C.O. Pak, H. Sakai, H. Sasaki, Y. Sato, K. Satoh, M. Satoh, T. Shidara, M. Shimada, T. Shioya, T. Shishido, T. Suwada, M. Tadano, T. Takahashi, R. Takai, T. Takenaka, Y. Tanimoto, M. Tobiyama, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, K. Watanabe, M. Yamamoto, S. Yamamoto, Y. Yamamoto, Y. Yano, M. Yoshida
    KEK, Ibaraki
  • M. Adachi, M. Katoh, H. Zen
    UVSOR, Okazaki
  • R. Hajima, R. Nagai, N. Nishimori, M. Sawamura
    JAEA/ERL, Ibaraki
  • H. Hanaki
    JASRI/SPring-8, Hyogo-ken
  • H. Iijima, M. Kuriki
    HU/AdSM, Higashi-Hiroshima
  • I. Ito, H. Kudoh, N. Nakamura, S. Shibuya, K. Shinoe, H. Takaki
    ISSP/SRL, Chiba
  • H. Kurisu
    Yamaguchi University, Ube-Shi
  • M. Kuwahara, T. Nakanishi, S. Okumi
    Nagoya University, Nagoya
  • S. Matsuba
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima
  • T. Muto
    Tohoku University, School of Scinece, Sendai
  • K. Torizuka, D. Yoshitomi
    AIST, Tsukuba
 
 

Future synchrotron light source using a 5-GeV-class energy recovery linac (ERL) is under proposal by our Japanese collaboration team, and we are conducting active R&D efforts for that. We are developing super-brilliant DC photocathode guns, two types of cryomodules for both injector and main superconducting linacs, 1.3 GHz high CW-power rf sources, and other important components. We are also constructing a compact ERL for demonstrating the recirculation of low-emittance, high-current beams using those key components. We present our recent progress in this project.

 
WEOAMH02 Recent Progress of KEKB 2372
 
  • Y. Funakoshi, T. Abe, K. Akai, Y. Cai, K. Ebihara, K. Egawa, A. Enomoto, J.W. Flanagan, H. Fukuma, K. Furukawa, T. Furuya, J. Haba, T. Ieiri, N. Iida, H. Ikeda, T. Ishibashi, M. Iwasaki, T. Kageyama, S. Kamada, T. Kamitani, S. Kato, M. Kikuchi, E. Kikutani, H. Koiso, M. Masuzawa, T. Mimashi, T. Miura, A. Morita, T.T. Nakamura, K. Nakanishi, M. Nishiwaki, Y. Ogawa, K. Ohmi, Y. Ohnishi, N. Ohuchi, K. Oide, T. Oki, M. Ono, M. Satoh, Y. Seimiya, K. Shibata, M. Suetake, Y. Suetsugu, T. Sugimura, Y. Susaki, T. Suwada, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, Y. Yamamoto, Y. Yano, K. Yokoyama, M. Yoshida, S.I. Yoshimoto, D.M. Zhou, Z.G. Zong
    KEK, Ibaraki
 
 

KEKB is an e-/e+ collider for the study of B physics and is also used for machine studies for future machines. The peak luminosity of KEKB, which is the world-highest value, has been still increasing. This report summarizes recent progress at KEKB.

 

slides icon

Slides

 
THPEA015 L-band Accelerator System in Injector Linac for SuperKEKB 3708
 
  • S. Matsumoto, M. Akemoto, T. Higo, H. Honma, K. Kakihara, T. Kamitani, H. Nakajima, K. Nakao, Y. Ogawa, Y. Yano, K. Yokoyama, M. Yoshida
    KEK, Ibaraki
 
 

In order to improve the capture efficiency of the positron produced at the target in present KEKB Injector linac, a new project has just started to utilize L-band (1298MHz) RF. The present S-band (2856MHz) capture cavities and successive three RF units are to be replaced by those of L-band. The specifications of the L-Band system should fulfill the demands of a positron damping ring downstream which is also to be under study for super KEKB project. Besides the whole design work of the system, our present ongoing work is rather concentrated on establishing L-Band RF source and accelerating structures.

 
THPEB046 RF Source of Compact ERL in KEK 3981
 
  • S. Fukuda, M. Akemoto, D.A. Arakawa, H. Honma, H. Katagiri, S. Matsumoto, T. Matsumoto, S. Michizono, T. Miura, H. Nakajima, K. Nakao, S. Sakanaka, T. Shidara, T. Takahashi, Y. Yano, M. Yoshida
    KEK, Ibaraki
 
 

ERL (Energy Recovery Linac) of 5GeV energy is a future plan in KEK and in order to study the technical feasibility, construction of a compact ERL machine (cERL) is considered. Beam energy and current of cERL are 245MeV and 100mA, respectively. As 1.3 GHz frequency and super conducting cavity are chosen for the RF system, similar technology with KEK STF is employed. From 2008, KEK started the preparation of cERL and one RF unit of injector linac is introduced in this fiscal 2009. A new cw klystron of 300kW out put power, 150kW Y-type circulator and high power water load were developed in FY2009. DC power supply was under manufacturing. Preliminary test of HLRF and the high power couplers are scheduled in the Photon Factory site by making use of the old DC power supply. For main accelerator, we also introduced a 30kW IOT and a 35kW klystron and a DC power supply. At the same time, cERL is determined to be constructed in the East Counter Hall in KEK and the design layout is preceded. In this paper, the recent RF source development of cERL is described. Layout of the east counter hall, where cERL is constructed, is progressed and shown in this report.

 
THPD007 The Linac Upgrade Plan for SuperKEKB 4290
 
  • T. Sugimura, M. Akemoto, D.A. Arakawa, A. Enomoto, S. Fukuda, K. Furukawa, T. Higo, H. Honma, M. Ikeda, E. Kadokura, K. Kakihara, T. Kamitani, H. Katagiri, M. Kurashina, S. Matsumoto, T. Matsumoto, H. Matsushita, S. Michizono, K. Mikawa, T. Miura, H. Nakajima, K. Nakao, Y. Ogawa, S. Ohsawa, M. Satoh, T. Shidara, A. Shirakawa, T. Suwada, T. Takenaka, Y. Yano, K. Yokoyama, M. Yoshida
    KEK, Ibaraki
 
 

The next generation B-factory 'SuperKEKB' project whose target luminosity is 8 ×1035 cm-2s-1 is under consideration. A 'nano-beam scheme' is introduced to the SuperKEKB. In the scheme, an electron beam (Energy = 7 GeV, Charge = 3-4 nC/bunch, Vertical emittance =2.8 x 10-5 m) and a positron beam (Energy = 4 GeV, Charge = 4 nC/bunch, Vertical emittance = 1.6 x 10-5 m), are required at the end of injector linac. They are quite challenging targets for the present linac. In order to meet the requirements, we will introduce some new components to the linac. They are a photo-cathode RF gun for an electron beam, a positron capture section using new L-band cavities, a newly designed positron-generation target system and a damping ring for a positron beam. This presentation shows a strategy of our injector upgrade.

 
MOPD046 Construction of New Injector Linac for RI Beam Factory at RIKEN Nishina Center 789
 
  • K. Yamada, S. Arai, M.K. Fujimaki, T. Fujinawa, N. Fukunishi, A. Goto, Y. Higurashi, E. Ikezawa, O. Kamigaito, M. Kase, M. Komiyama, K. Kumagai, T. Maie, T. Nakagawa, J. Ohnishi, H. Okuno, N. Sakamoto, Y. Sato, K. Suda, H. Watanabe, Y. Watanabe, Y. Yano, S. Yokouchi
    RIKEN Nishina Center, Wako
  • H. Fujisawa
    Kyoto ICR, Uji, Kyoto
 
 

A new additional injector (RILAC2) is constructed at RIKEN Nishina Center in order to enable the independent operation of the RIBF experiments and super-heavy element synthesis. The RILAC2 consists of a 28 GHz superconducting ECR ion source, a low-energy beam transport with a pre-buncher, a four-rod RFQ linac, a rebuncher, three DTL tanks, and strong Q-magnets between the rf resonators for the transverse focusing. Very heavy ions with m/q of 7 such as 136Xe20+ and 238U35+ will be accelerated up to the energy of 680 keV/u in the cw mode and be injected to the RIKEN Ring Cyclotron without charge stripping. The RFQ linac, the last tank of the DTL, and the bunchers have been converted from old ones in order to save the cost. Construction of the RILAC2 started at the end of the fiscal 2008. The RFQ and DTLs will be installed in the AVF cyclotron vault and be tested in March 2010. The ECR ion source and low-energy beam transport will be set on the RILAC2 in 2010 summer, and the first beam will be accelerated in 2010 autumn. We will present the details of the linac part of RILAC2 as well as the progress of construction which includes the result of high power test of resonators.