A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Wildman, D.

Paper Title Page
THPEC044 Design Methodology and Considerations for NOνA 53 MHz RF Cavities 4158
 
  • C.R. Ader, D. Wildman
    Fermilab, Batavia
 
 

The NOνA Experiment will construct a detector optimized for electron neutrino detection in the existing Neutrino at Main Injector (NuMI) beamline. This beamline is capable of operating at 400 kW of primary beam power and the upgrade will allow up to 700 kW. The cavities will operate at 53 MHz and three of them will be installed in the Recycler beamline. Thermal stability of the cavities is crucial since this affects the tuning. Results of finite element thermal and structural analysis involving the copper RF cavity will be presented.