A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Spataro, C.J.

Paper Title Page
TUPEC042 NSLS-II Transport Line Performance 1820
 
  • R.P. Fliller, W.R. Casey, R. Faussete, H. Fernandes, G. Ganetis, R. Heese, H.-C. Hseuh, P.K. Job, B.N. Kosciuk, R. Meier, D. Padrazo, I. Pinayev, J. Rose, T.V. Shaftan, O. Singh, J. Skaritka, C.J. Spataro, G.M. Wang
    BNL, Upton, Long Island, New York
 
 

The NSLS-II injection system consists of a 200 MeV linac and a 3 GeV booster synchrotron and associated transport lines. The transport lines need to transport the beam from the linac to the booster and from the booster to the storage ring in a way that provide high injection efficiency. In this paper we discuss progress on specifying and prototyping the NSLS-II transfer lines including diagnostics, magnet specifications, and safety systems. Commissioning plans are also discussed.

 
WEPEA082 Status of the NSLS-II Injection System Development 2672
 
  • T.V. Shaftan, A. Blednykh, W.R. Casey, L.R. Dalesio, R. Faussete, M.J. Ferreira, R.P. Fliller, G.S. Fries, G. Ganetis, W. Guo, R. Heese, H.-C. Hseuh, Y. Hu, P.K. Job, E.D. Johnson, Y. Kawashima, B.N. Kosciuk, S. Kowalski, S. Krinsky, Y. Li, H. Ma, R. Meier, S. Ozaki, D. Padrazo, B. Parker, I. Pinayev, M. Rehak, J. Rose, S. Sharma, O. Singh, P. Singh, J. Skaritka, C.J. Spataro, G.M. Wang, F.J. Willeke, L.-H. Yu
    BNL, Upton, Long Island, New York
 
 

We discuss status and plans of development of the NSLS-II injector. The injector consists of 200 MeV linac, 3-GeV booster, transport lines and injection straight section. The system design is now nearly completed and the injector development is in the procurement phase. The injector commissioning is planned to take place in 2012.

 
WEPD049 Progress on Insertion Device Related Activities at the NSLS-II and its Future Plans 3204
 
  • T. Tanabe, O.V. Chubar, T.M. Corwin, D.A. Harder, P. He, G. Rakowsky, J. Rank, C.J. Spataro
    BNL, Upton, Long Island, New York
 
 

National Synchrotron Light Source-II (NSLS-II) project is now in the construction stage. A new insertion device (ID) magnetic measurement facility (MMF) is being set up at Brookhaven National Laboratory in order to satisfy the stringent requirement on the magnetic field measurement of IDs. ISO-Class7 temperature stabilized clean room is being constructed for this purpose. A state-of-the-art Hall probe bench and integrated field measurement system will be installed therein. IDs in the project baseline scope include six damping wigglers, two elliptically polarizing undulators (EPUs), three 3.0m long in-vacuum undulators (IVUs) and one 1.5m long IVU. Three-pole wigglers with peak field over 1 Tesla will be utilized to accommodate the users of bending magnet radiation at the NSLS. Future plan includes: 1) an in-vacuum magnetic measurement system, 2) use of PrFeB magnet for improved cryo undulator, 3) development of advanced optimization program for sorting and shimming of IDs, 4) development of a closed loop He gas refrigerator, 5) switchable quasi-periodic EPU. Design features of the baseline devices, IDMMF and the future plans for NSLS-II ID activities are described.