A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Ohmori, C.

Paper Title Page
TUPD010 Simulation of Longitudinal Emittance Control in J-PARC RCS 1940
 
  • M. Yamamoto, M. Nomura, A. Schnase, T. Shimada, H. Suzuki, F. Tamura
    JAEA/J-PARC, Tokai-mura
  • E. Ezura, K. Hara, K. Hasegawa, C. Ohmori, M. Tada, A. Takagi, K. Takata, M. Yoshii
    KEK, Ibaraki
 
 

The Longitudinal emittance in J-PARC RCS should be controlled to accelerate a high intensity proton beam with minimal beam loss. In order to study and minimize the beam loss during acceleration, the optimized way to add the 2nd higher harmonic rf has been calculated by a particle tracking code. Furthermore, the bunch shape at RCS extraction should be controlled and optimized for the MR injection. For this purpose, the optimum RCS acceleration pattern has been calculated. We describe the simulation results and the comparison with the beam test.

 
THPEA011 Simulation of Magnetic Alloy Loaded RF Cavity and HOM Analysis 3697
 
  • K. Hasegawa, K. Hara, C. Ohmori, M. Tada, M. Yoshii
    KEK, Ibaraki
  • M. Nomura, A. Schnase, F. Tamura, M. Yamamoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
 
 

The RF cavity using Magnetic Alloy (MA) cores has been developed for achieving the high field gradient in J-PARC. For reducing the beam loading effects, the Q-value of the RF cavities in the Main Ring (MR) is controlled by using the cut-core configuration. In order to check the effect of HOMs between the cut-core gap, a simulation method of MA cores was studied and electromagnetic fields of excitation modes have been calculated by HFSS. We present the detail of the simulation method of MA cores and the HOM analysis of the cavity with the cut-cores.

 
THPEA016 Developments of Magnetic Alloy Cores with Higher Impedance for J-PARC Upgrade 3711
 
  • C. Ohmori, K. Hasegawa, A. Takagi
    KEK, Ibaraki
  • K. Hara, T. Shimada, H. Suzuki, M. Tada, M. Yoshii
    KEK/JAEA, Ibaraki-Ken
  • M. Nomura, A. Schnase, F. Tamura, M. Yamamoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
 
 

Magnetic alloy cavities are successfully used for J-PARC synchrotrons. These cavities generate much higher RF voltage than ordinary ferrite cavities. For future upgrades of J-PARC facilities, a higher field gradient is necessary. It was found that the characteristics of magnetic alloy is improved by a new annealing scheme under magnetic field. A large production system using an old cyclotron magnet is under construction for the J-PARC upgrade. The status of core development will be reported.

 
THPEA017 A Magnetic Alloy loaded RF Cavity System for EMMA 3714
 
  • C. Ohmori
    KEK, Ibaraki
  • J.S. Berg
    BNL, Upton, Long Island, New York
 
 

An RF system using Magnetic Alloy is considered as an option to study the beam dynamics of a linear non-scaling FFAG. Such an FFAG may have many resonances, which affect the beam more when the beam crosses them slowly. The RF system aims at ordinary RF bucket acceleration with an RF frequency sweep of 3 % in 100 turns. The cavity has only 10 cm length to fit in a short straight section. The required RF voltage is 100 kV per turn and each of the three cavities is designed to generate 50 kV.

 
THPEA019 Thermal Deformation of Magnetic Alloy Cores for J-PARC RCS RF Cavities 3717
 
  • T. Shimada
    KEK/JAEA, Ibaraki-Ken
  • K. Hara, K. Hasegawa, C. Ohmori, M. Tada, M. Yoshii
    KEK, Ibaraki
  • M. Nomura, A. Schnase, H. Suzuki, F. Tamura, M. Yamamoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
 
 

Several magnetic alloy cores of the RF cavities, which are installed in the 3 GeV rapid cycling synchrotron (RCS) of J-PARC have shown buckling after about two years operation. To find the reason, why the local deformation happened, we made a test setup. There we heat up MA cores in air by 500 kHz RF and measure the thermal deformation in order to collect information about the buckling process. The results obtained by comparing the expansion of cores made by different production methods are reported.

 
MOPEC065 Recent Status and Future Plan of J-PARC MA Loaded RF Systems 615
 
  • M. Yoshii, K. Hara, C. Ohmori, T. Shimada, H. Suzuki, M. Tada
    KEK/JAEA, Ibaraki-Ken
  • E. Ezura, K. Hasegawa, A. Takagi, K. Takata
    KEK, Ibaraki
  • M. Nomura, A. Schnase, F. Tamura, M. Yamamoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
 
 

The Japan Proton Accelerator Complex includes the 3GeV rapid cycling synchrotron (RCS) and the 50GeV main ring synchrotron (MR). Both synchrotrons use the high field gradient magnetic alloy (MA) loaded cavities. In RCS, 11 RF systems have been fully operational since December 2008. The RCS RF systems are operated with dual-harmonic acceleration voltages. Beam acceleration and bunch shape manipulation are efficiently taking place. 120kW of the neutron user operation was started at the Material and Life science facilities in November 2009. In MR synchrotron, the 5th RF system were installed in August 2009, and therefore 5 RF systems are now in operation. Beam commissioning for delivering protons to the hadron facility and neutrino beam experimental facility are under way. The neutrino user experiment is intended to start January 2010. Proton beam operation with more than 100kW is required. The approaches to realizing high intensity operation and the MR upgrade plan will be presented.

 
TUPEA050 Dual-harmonic Phase Control in the J-PARC RCS 1443
 
  • F. Tamura, M. Nomura, A. Schnase, T. Shimada, H. Suzuki, M. Yamamoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • K. Hara, C. Ohmori, M. Tada, M. Yoshii
    KEK/JAEA, Ibaraki-Ken
  • K. Hasegawa
    KEK, Ibaraki
 
 

The wide-band RF cavities in the J-PARC RCS are operated in the dual-harmonic operation, in which each single cavity is driven by a superposition of the fundamental and the second harmonic RF signals. By the dual-harmonic operation large amplitude second harmonic signals for the bunch shape manipulation are generated without extra cavities. The phase control of the second harmonic RF is a key for the bunch shape manipulation. The fundamental RF signal is controlled by the phase feedback loop to damp the dipole oscillation. The second harmonic is locked to the phase of the vector-sum phase of the fundamental RF signals. We present the system detail and the performance in the beam operation of the RCS.

 
TUPEA051 Application of Digital Narrow Band Noise to J-PARC Main Ring 1446
 
  • A. Schnase, K. Hasegawa, M. Nomura, T. Shimada, H. Suzuki, F. Tamura, M. Yamamoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • K. Hara, C. Ohmori, M. Tada, M. Yoshii
    KEK/JAEA, Ibaraki-Ken
  • T. Koseki, T. Toyama
    J-PARC, KEK & JAEA, Ibaraki-ken
  • M. Tomizawa
    KEK, Ibaraki
 
 

Applying narrow band longitudinal noise to the beam in J-PARC Main Ring in flattop, while the acceleration voltage is off might help to counteract the effect of ripple on the slow extraction. For this purpose, a complex noise sequence output by DSP modulates a custom made DDS synthesizer to create single side spectra without carrier. The noise is calculated starting from a description in frequency domain. Then an algorithm creates narrow band spectra with optimized behavior in time domain. Frequency domain data is transformed to time domain, and the amplitude is smoothed. The smoothed data is transformed back to frequency domain, and the spectral shape is restored. This process repeats until the amplitude in time domain has converged, while the desired spectrum shape is preserved. Noise generated in this way can be tailored for different requirements. We show the signal properties, the hardware, and preliminary beam test results, when the noise is applied to the MR RF system.

 
THPEA022 Condition of MA Cores in the RF Cavities of J-PARC Synchrotrons after Several Years of Operation 3723
 
  • M. Nomura, A. Schnase, T. Shimada, H. Suzuki, F. Tamura, M. Yamamoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • E. Ezura, K. Hara, C. Ohmori, M. Tada, M. Yoshii
    KEK/JAEA, Ibaraki-Ken
  • K. Hasegawa, K. Takata
    KEK, Ibaraki
 
 

We have been operating the RF cavities loaded with MA cores with a high field gradient of more than 20 kV/m since October 2007. We have been measuring the RF cavity impedance at the shutdown periods, and we detected the impedance reductions of RCS RF cavities on January and June 2009. Taking out the RF cavities from the beam line and opening them, we found that many of cores showed a buckling at the inner radius. Also detachment of the epoxy coating intended to prevent rusting was observed. We report the detail of condition of MA cores and the relation between the impedance reduction and core condition.

 
WEPE056 Accelerator and Particle Physics Research for the Next Generation Muon to Electron Conversion Experiment - the PRISM Task Force 3473
 
  • J. Pasternak, L.J. Jenner, Y. Uchida
    Imperial College of Science and Technology, Department of Physics, London
  • R.J. Barlow
    UMAN, Manchester
  • K.M. Hock, B.D. Muratori
    Cockcroft Institute, Warrington, Cheshire
  • D.J. Kelliher, S. Machida, C.R. Prior
    STFC/RAL/ASTeC, Chilton, Didcot, Oxon
  • Y. Kuno, A. Sato
    Osaka University, Osaka
  • A. Kurup
    Fermilab, Batavia
  • J.-B. Lagrange, Y. Mori
    KURRI, Osaka
  • M. Lancaster
    UCL, London
  • S.A. Martin
    FZJ, Jülich
  • C. Ohmori
    KEK/JAEA, Ibaraki-Ken
  • J. Pasternak
    STFC/RAL, Chilton, Didcot, Oxon
  • S.L. Smith
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire
  • H. Witte, T. Yokoi
    JAI, Oxford
 
 

The next generation of lepton flavour violation experiments will use high intensity and high quality muon beams. Such beams can be produced by sending a short proton pulse to the pion production target, capturing pions and performing RF phase rotation on the resulting muon beam in an FFAG ring, which was proposed for the PRISM project. A PRISM task force was created to address the accelerator and detector issues that need to be solved in order to realise the PRISM experiment. The parameters of the initial proton beam required and the PRISM experiment are reviewed. Alternative designs of the PRISM FFAG ring are presented and compared with the reference design. The ring injection/extraction system, matching with the solenoid channel and progress on the ring's main hardware systems like RF and kicker magnet are discussed. The activity on the simulation of a high sensitivity experiment and the impact on physics reach is described. The progress and future directions of the study are presented in this paper.