A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Leinonen, P.M.

Paper Title Page
TUPEA056 CERN's PS Booster LLRF Renovation: Plans and Initial Beam Tests 1461
 
  • M. E. Angoletta, A. Blas, A.C. Butterworth, A. Findlay, P.M. Leinonen, J.C. Molendijk, F. Pedersen, J. Sanchez-Quesada, M. Schokker
    CERN, Geneva
 
 

In 2008 a project was started to renovate the CERN's PS Booster (PSB) low-level RF (LLRF). Its aim is to equip all four PSB rings with modern LLRF systems by 2013 at the latest. Required capabilities for the new LLRF include frequency program, beam phase, radial and synchronization loops. The new LLRF will control the signals feeding the three RF cavities present in each ring; it will also shape the beam in a dual harmonic mode, operate a bunch splitting and create a longitudinal blow-up. The main benefits of this new LLRF are its full remote and cycle-to-cycle controllability, built-in observation capability and flexibility. The overall aim is to improve the robustness, maintainability and reliability of the PSB operation and to make it compatible with the injection from the future LINAC4. The chosen technology is an evolution of that successfully deployed in CERN's ion accumulator ring LEIR and it is based upon modular VME 64X hardware and extensive digital signal processing. This paper outlines the main characteristics of the software and hardware building blocks. Promising initial beam tests are shown and hints are included on the main milestones and future work.