Lee, Y.Y.

Paper Title Page
MOPD005 Design of PEFP RCS 678
 
  • J.-H. Jang, Y.-S. Cho, H.S. Kim, H.-J. Kwon
    KAERI, Daejon
  • Y.Y. Lee
    BNL, Upton, Long Island, New York
 
 

As a feasible extension plan of the proton engineering frontier project (PEFP) 100-MeV proton linac, the conceptual design of an rapid cycling synchrotron (RCS) is under progress. The main purpose of the synchrotron is a spallation neutron source and it also includes the slow extraction option for basic and applied science research. In the initial stage, the beam power is 60 kW by using a scheme of 100-MeV injection and 1-GeV extraction. There is a scheme to increase power to 500 kW through a 3-stage upgrade. The injection and extraction energies will be 200-MeV and 2-GeV respectively after the final upgrade. This article summarizes the present status of the RCS design. It includes the physics design including injection and acceleration, and conceptual design of some magnets and RF cavity.