A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Ishii, A.

Paper Title Page
WEPEC029 Power Coupler Development for ERL Main LINAC in Japan 2953
 
  • H. Sakai, T. Furuya, S. Sakanaka, T. Takahashi, K. Umemori
    KEK, Ibaraki
  • A. Ishii, N. Nakamura, K. Shinoe
    ISSP/SRL, Chiba
  • M. Sawamura
    JAEA/ERL, Ibaraki
 
 

We started to develop an input power coupler for a 1.3GHz ERL superconducting cavity for ERL main linac. Required input power is about 20kW for the cavity acceleration field of 20MV/m and the beam current of 100mA in energy recovery operation. The input coupler is designed based on the STF-BL input coupler, especially choke-mode type ceramic window was applied. After that some modifications are applied for the CW 20kW power operation. We fabricated input coupler components such as ceramic windows and bellows and carried out the high-power test of the components by using a 30kW IOT power source and a test stand constructed.