WEPEB015 Recent Improvements of the RF Beam Control for LHC-type Beams in the CERN PS 2716
 
  • H. Damerau, S. Hancock, M. Schokker
    CERN, Geneva
 
 

To cope with the large variety of different beams for the LHC, the RF beam control in the CERN PS has evolved continuously to improve its flexibility and reliability. Single-bunch beams, several different multi-bunch beams with 25, 50 or 75 ns bunch spacing at ejection for LHC filling, as well as two lead-ion beam variants are now regularly produced in pulse-to-pulse operation. The multi-bunch beam control for protons can be easily re-adjusted from 0.25·1011 to 1.3·1011 particles per ejected bunch. Depending on the number of bunches injected from the PS Booster, the length of the ejected bunch train may vary from 8 to 72 bunches. This paper summarizes recent improvements in the low-level RF systems and gives an outlook on the future consolidation.

 
WEPEB042 Optimization of the Position of the Radial Loop Pickups in the CERN PS 2782
 
  • S. Aumon
    EPFL, Lausanne
  • S. Aumon, H. Damerau, S.S. Gilardoni
    CERN, Geneva
 
 

A part of the beam losses at transition crossing of high intensity beams in the CERN PS have been attributed to an excursion of the closed orbit. The orbit jump occurs simultaneously with the jump of the transition energy triggered by pulsed quadrupoles. Investigations showed that the position of the pickups used for the radial loop system was not optimized with respect to the dispersion change caused by the fast change of the transition energy. Thanks to new electronics of the orbit measurement system, turn-by-turn orbit data could be recorded around transition crossing. Their analysis, together with calculations of the transverse optics, allowed determining a new choice of pickup positions for the radial loop. In comparison to the previous pickup configuration, the new configuration improves the mean radial position not only during transition crossing, but all along the acceleration cycle.

 
THOBMH02 Results from the 2009 Beam Commissioning of the CERN Multi-turn Extraction 3619
 
  • M. Giovannozzi, E. Benedetto, A. Blas, T. Bohl, S. Cettour Cave, K. Cornelis, D.G. Cotte, H. Damerau, M. Delrieux, J. Fleuret, F. Follin, T. Fowler, P. Freyermuth, H. Genoud, S.S. Gilardoni, S. Hancock, O. Hans, Y. Le Borgne, D. Manglunki, E. Matli, G. Metral, E. Métral, M. Newman, L. Pereira, F.C. Peters, Y. Riva, F. Roncarolo, L. Sermeus, R.R. Steerenberg, B. Vandorpe, J. Wenninger
    CERN, Geneva
  • F. Franchi
    ESRF, Grenoble
 
 

Following the analysis of the results obtained during the first year of beam commissioning of the CERN multi-turn extraction, a number of changes have been introduced in the beam manipulations performed in the CERN Proton Synchrotron. This includes a different control of the linear chromaticity, the setting of the non-linear magnets used to split the beam, and the longitudinal structure in the PS. The results obtained during the 2009 run are presented and discussed in detail, including the beam performance in both the PS and the SPS, as well as the optics measurements in the transfer line between the two circular machines.

 