A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Chritin, N.C.

Paper Title Page
MOPE060 Spectrometry in the Test Beam Line at CTF3 1113
 
  • M. Olvegård, E. Bravin, F. Carra, N.C. Chritin, A.E. Dabrowski, A. Dallocchio, S. Döbert, T. Lefèvre
    CERN, Geneva
  • E. Adli
    University of Oslo, Oslo
 
 

The CLIC study is based on the so‐called two‐beam acceleration concept and one of the main goals of the CLIC Test Facility 3 is to demonstrate the efficiency of the CLIC RF power production scheme. As part of this facility a Test Beam Line (TBL), presently under commissioning, is a small scale version of a CLIC decelerator. To perform as expected the beam line must show efficient and stable RF power production over 16 consecutive decelerating structures. As the high intensity electron beam is decelerated its energy spread grows by up to 60%. A novel segmented beam dump for time resolved energy measurements has been designed to match the requirements of the TBL. As a complement, a diffusive OTR screen is also installed in the same spectrometer line. The combination of these two devices will provide both a high spatial resolution measurement of both the energy and energy spread and a measurement with a few nanoseconds time response. This paper describes the design of the new segmented dump and presents the results from the first commissioning of the TBL spectrometer line.