A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Borburgh, J.

Paper Title Page
THPEB032 Design and Development of Kickers and Septa for MedAustron 3954
 
  • J. Borburgh, B. Balhan, M.J. Barnes, T. Fowler, M. Hourican, M. Palm, A. Prost, L. Sermeus, T. Stadlbauer
    CERN, Geneva
  • F. Hinterschuster
    TU Vienna, Wien
  • T. Kramer
    EBG MedAustron, Wr. Neustadt
 
 

The MedAustron facility, to be built in Wiener Neustadt (Austria), will provide protons and different types of ions for cancer therapy and research. Ten different types of bumpers, septa and kickers will be used in the low energy beam transfer line, the synchrotron and the high energy extraction lines. They are presently being designed in collaboration with CERN. Both 2D and 3D finite element simulations have been carried out to verify and optimize the field strength and homogeneity for each type of magnet and, where applicable, the transient field response. The detailed designs for the injection and dump bumpers, the magnetic septa and the fast chopper dipoles are presented. A novel design for the electrostatic septa is outlined.

 
THPEC083 Dump and Current Measurement of Unstripped H- Ions at the Injection from the CERN LINAC4 into the PS Booster 4249
 
  • R. Chamizo, J. Borburgh, B. Goddard, A. Mereghetti, R. Versaci, W.J.M. Weterings
    CERN, Geneva
 
 

Linac4 is the new H- linear accelerator under construction at CERN aiming to double the brightness of the beam injected to the CERN PS Booster (PSB) for delivering proton beams to experiments or further CERN accelerators, down to the LHC. The injection system in the PSB is based on the H- charge exchange where the 160 MeV H- beam is converted into an H+ beam by stripping the electrons with a carbon foil. A beam dump located inside a pulsed magnet for the injection bump will intercept the unstripped ions (H0 and H-) and measure the collected charge to detect the relative efficiency and degradation of the stripping foil. The challenge of the dump design is to meet the requirements of a beam dump providing a current measurement and at the same time minimizing the perturbation of the magnetic field of the surrounding pulsed magnet. This paper describes all phases of the dump design and the main issues related to its integration in the line.