A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Bastos, M.C.

Paper Title Page
WEPD070 High Precision Current Control for the LHC Main Power Converters 3260
 
  • H. Thiesen, M.C. Bastos, G. Hudson, Q. King, V. Montabonnet, D. Nisbet, S.T. Page
    CERN, Geneva
 
 

The LHC was restarted on the 20th of November 2009 after 14 months of shutdown. The machine is composed of 8 powering sectors, each containing a main dipole circuit and two main quadrupole circuits. Each of these main circuits is entirely independent. To operate the LHC, the magnetic fields in the main magnets must be controlled with unprecedented accuracy. Indeed, the current in each power converter must be controlled with an accuracy of a few ppm (parts per million of nominal current) and the currents must be perfectly synchronised between sectors. To achieve the performance required of the LHC power converters, many challenges have been resolved. These include: measuring the power converter currents with an extreme absolute precision, control of these currents without tracking error or overshoot, perfect synchronisation of the current references sent to the power converters of the 24 main circuits. This paper details how these various problems have been resolved to obtain the performance required. Many experimental results are included, in particular the results of the tracking tests performed with the main circuits of the LHC.