A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Al-Adwan, A.

Paper Title Page
WEOARA02 Progress Report of SESAME Project 2424
 
  • A. Nadji, T.H. Abu-Hanieh, A. Al-Adwan, M.A. Al-najdawi, A. Amro, M. Attal, S. Budair, D.S. Foudeh, A. Hamad, A. Kaftoosian, T.A. Khan, F. Makahleh, S.A. Matalgah, M. Sbahi, M.M. Shehab, H. Tarawneh, S. Varnasseri
    SESAME, Allan
 
 

The construction of SESAME, a 2.5 GeV, and 3rd generation synchrotron-light source is under progress. The first electron beam from the Microtron at low energy (less than 10 MeV) could be obtained on July, 14th, 2009 and reproduced several times. The tests of the injection and extraction system as well as the hydraulically and electrical tests of the main magnets of the Booster are complete and the vacuum chambers tests are underway. The Booster RF cavity and its plunger have been conditioned successfully by 1.7 kW CW RF power. The installation of the Booster is expected to start after the completion of the shielding. The design of the completely new storage ring is finalised and the Phase 1 beamlines is updated.

 

slides icon

Slides